On April 28, the control gate of the South Canal of the Sinv Temple Hub in Dezhou City, Shandong Province was opened, filling the entire Beijing-Hangzhou Grand Canal with water (drone photo).

At 10:00 on April 28, the control gate of the South Canal at the Sinv Temple Hub in Dezhou, Shandong was opened, and the water of Yuecheng Reservoir passed through the Wei Canal and merged with the water of the north extension project of the east line of the South-to-North Water Diversion Project and the Yellow River Diversion Project, and entered the South Canal; located in Jinghai District, Tianjin The control gate of the South Canal of the Jiuxuanzha Hub was opened, and the water from the south merged with the local water in Tianjin through the South Canal.

So far, the Beijing-Hangzhou Grand Canal has been fully opened to water.

Photo by Xinhua News Agency reporter Guo Xulei


Release time: 2022-04-28 21:04:41 【Editor: Li Peiyun】