【On-site contemporaneity】Tonight's operation is mainly the inspection of the operation vehicle from Mohan to Boding.

【Commentary】At 11:<> p.m., the staff of the Mohan Comprehensive Maintenance Area of China Railway Kunming Bureau Group were preparing for the "skylight operation". Together with the workers of the Lao section, they will jointly overhaul the catenary equipment of the China-Laos Railway Friendship Tunnel.

【Commentary】The China-Laos Railway Friendship Tunnel is located on the border of China and Laos and is a cross-border tunnel of the China-Laos Railway. In order to do a good job in the passage of China-Laos international passenger trains, the railway staff of China and Laos have always stayed here, and during each joint maintenance, they can have a "meeting in the air" in the tunnel.

【During the same period】China Railway Kunming Bureau Group Mohan Comprehensive Maintenance Area Squad Leader Frontier

The Friendship Tunnel is the junction of China and Laos, and in order to ensure the normal passage of transit trains, we have to go in every month to conduct daily inspections of equipment.

【Commentary】The operation leader of the China section overhaul was transferred to the Mohan Comprehensive Maintenance Work Area of the China-Laos Railway in 2021, and is now a maintenance team leader.

【Site at the same time】We jointly inspected the catenary equipment of the friendship tunnel with Laos. You look over here, I look over here.

【Commentary】At 12 o'clock at night, the maintenance personnel of the two countries met at the border between China and Laos, and after the division of labor was arranged, the two sides immediately put into the intense maintenance and inspection work.

【Commentary】There are 740 catenary crane strings in the Chinese section of the Friendship Tunnel, and they have to check them one by one, and any minor hidden dangers may affect the safe operation of international passenger trains.

【During the same period】China Railway Kunming Bureau Group Mohan Comprehensive Maintenance Area Squad Leader Frontier

Due to the large number of running bow sorties, this is lifted for a long time, and then the upper nut is loosened.

At the same time, the inspection of the Lao section on the other side is also nearing completion. They have been doing overhauls like this for more than a year. Today, the international passenger trains of the China-Laos Railway are running smoothly, and they have gained heavy responsibilities and missions.

【During the same period】China Railway Kunming Bureau Group Mohan Comprehensive Maintenance Area Squad Leader Frontier

I feel like my name, my name is Frontier, I am in the frontier, the most frontier of the motherland, almost ten kilometers away from the border, it can be regarded as a real frontier, which exactly echoes my name.

【Commentary】The China-Laos Railway Friendship Tunnel has a total length of 9.68 kilometers, including 7.17 kilometers in the Chinese section and 2.51 kilometers in the Laos section. Under the illumination, the railway staff of the two countries used perseverance and responsibility to ensure the safe operation of international trains.

Reporting by Yuan Hongkai, Yao Wei, He Lupeng, and Mohan, Yunnan

Responsible Editor: [Liu Pai]