The reporter learned from the Maritime Safety Administration of the Ministry of Transport that from March 23, the high-speed passenger ferry route from Shekou to Hong Kong Airport and the upstream sea route in the Bay Area, which were suspended due to the epidemic, will resume operations.

According to the plan, after the flight resumes, two flights will be arranged each day.

Passengers must take the boat with the green code of the Yuekang code, the green code of the itinerary and the negative result of the nucleic acid test within 48 hours. For the flight from Shekou to Hong Kong Airport, the epidemic prevention requirements of the destination shall prevail.

  It is understood that in order to ensure the smooth resumption of operation of water passenger routes, the Shenzhen Maritime Safety Administration has carried out special inspections on relevant ship key equipment, crew practical operations and implementation of epidemic prevention measures in advance to ensure that the ship is seaworthy and the crew is competent.

For ships operating on cross-border high-speed passenger ship routes, strictly implement the requirements of "preventing importation" of the epidemic, and innovatively implement "remote supervision" to reduce unnecessary contacts.

At the same time, through the "electronic + on-site" dual inspection mode, the frequency of inspection and law enforcement on the main water passenger routes and waters in the jurisdiction is strengthened, the navigation environment of the waters in the jurisdiction is grasped in real time, and the early warning and pre-control of severe weather such as strong winds, fog, thunderstorms, etc. are strengthened to provide water passenger routes. Provide security services.

(Headquarters CCTV reporter Tang Ying)