my country's first self-developed million-kilowatt distributed control system was successfully put into operation


  Yesterday (25th), my country's first domestically developed nationally produced million-kilowatt distributed control system was successfully put into operation at Huaneng Yuhuan Power Plant, marking that my country's core control equipment in the field of high-parameter and large-capacity power generation has achieved independent controllability.

  The decentralized control system, known as the "brain" of thermal power plants, is a key equipment to ensure stable power supply and an important foundation for the safe operation of the power grid.

The "Ruiwo" system put into operation this time is the first in China based on domestic chips and a domestic operating system, with 100% independent intellectual property rights.

Chen Feng, director of Huaneng Yuhuan Power Plant:

The system put into operation this time integrates the advantages of various types of systems at home and abroad and further optimizes and upgrades. Many system indicators such as hardware board accuracy and anti-interference ability exceed similar products at home and abroad.