According to JR Tokai, the Tokaido Shinkansen had a rain gauge installed in Shizuoka prefecture that exceeded the standard, so the operation was suspended between Toyohashi and Mishima on the uphill and between Shin-Yokohama and Nagoya on the downhill, but 10 pm Operation resumed on all lines at around 50 minutes.