According to JR Tokai, the Tokaido Shinkansen had a rain gauge installed in Shizuoka prefecture that exceeded the standard, so the operation was suspended between Toyohashi and Mishima on the uphill and between Shin-Yokohama and Nagoya on the downhill, but 10 pm Operation resumed on all lines at around 50 minutes.
Resumed operation on all Tokaido Shinkansen lines
2022-07-09T14:16:38.054Z
[NHK] According to JR Tokai, the Tokaido Shinkansen has exceeded the standard for rain gauges installed in Shizuoka prefecture, so the uphill is between Toyohashi and Mishima, and the downhill is Shinyoko ...
Source: nhk