On November 24, in an uninhabited area near 1,800 meters above sea level in Yangqu County, Taiyuan City, Shanxi Province, more than 200 electric power employees of State Grid Shanxi Power Transmission and Transformation Engineering Co., Ltd. worked non-stop to ensure power transmission.

This is the construction site of the 500kV delivery project in Taiyuan North, and the local temperature has dropped below zero.

The activity rooms of the team’s resident are covered with plastic sheets for heat preservation.

In order to avoid the hidden dangers of using fire, they eat self-heating food in the area of ​​returning farmland to forest.

(Wang Huilin, Su Jinyu, Wang Hao)

Editor in charge: [Ji Xiang]