On the evening of August 23, after a 40-minute “magnificent turn”, the main span of the Taichengxi Bridge on the Fuxia High-speed Railway completed a clockwise rotation of 40 degrees and successfully completed the twisting and docking.

This marks the smooth closure of China's first high-speed rail large-tonnage unbalanced twisting cable-stayed bridge, which has broken through the bottleneck in the construction of the entire Fuxia high-speed rail project and laid a solid foundation for the opening of the Fuxia high-speed rail to traffic.

The Fuxia High-speed Railway is China's first cross-sea high-speed railway with a total length of 277.42 kilometers. The Taichengxi Bridge is located in Jingyang Town, Fuqing City, Fujian Province, with a total length of 728.13 meters. It is a key control project for the entire line.

The picture shows that the main span of the Taichengxi Bridge on the Fuxia High-speed Railway has been rotated 40 degrees clockwise and then successfully completed the swivel docking.

Photo by Yang Cunxing


Release time: 2021-08-24 10:26:33 【Editor: Zhai Lu】