Due to heavy rain, the Sanyo Shinkansen was suspended on the up and down lines between Hiroshima Station and Hakata Station, but as a result of the inspection, it was confirmed that it was safe and resumed operation at 9:06 pm.
Sanyo Shinkansen resumed operation Hiroshima-Hakata up and down line
2021-08-14T12:43:04.818Z
[NHK] The Sanyo Shinkansen was suspended on the up and down lines between Hiroshima Station and Hakata Station due to heavy rain, but as a result of the inspection, safety was confirmed at 9 pm ...
Source: nhk