On January 19, Shandong Qixia Hushan Gold Mine Explosion Emergency Rescue Headquarters further optimized its work thinking and clarified the "3+1" overall rescue plan, "3" means: life maintenance monitoring channel (bore 1 and 3) , Life rescue channel (wellbore and No. 10 borehole), drainage guarantee channel (No. 7 and No. 8 boreholes); "1" means: auxiliary detection channel (No. 4, No. 6 and No. 9 boreholes).

Currently, there are a total of 10 drill holes at the rescue site. Drill hole No. 10 is used as a rescue escape route.

  There are 16 professional rescue teams and 1 fire rescue team, 589 rescuers, 388 sets of rescue equipment, and they are working overtime around the clock to open life channels.

  (Reporter Yang Bing)

Editor in charge: [Lu Yan]