China News Service, September 3, according to the website of the Ministry of Emergency Management, the center of this year’s No. 9 Typhoon "Mesaac" moved to Helong City, Yanbian Korean Autonomous Prefecture, Jilin Province, at around 13:40 on September 3. Typhoon No. 10 "Poseidon" has been strengthened to typhoon level, and the strongest can reach super typhoon level.

The National Defense Office and the Emergency Management Department held a conference and dispatch meeting on the 3rd to arrange the deployment of dual typhoon "Mesaac" and "Poseidon" defense work.

On September 3, Changchun, Jilin, citizens traveled in the wind and rain.

Photo by China News Agency reporter Zhang Yao

  According to reports, under the influence of "Mesaq", there will be heavy to heavy rains in the next 24 hours in northeastern Liaoning, Jilin, most of Heilongjiang, and northeastern Inner Mongolia; there will be 8-9 strong winds in parts of eastern Jilin and southwest Heilongjiang. The gust can reach level 10-11.

  Huang Ming, deputy commander-in-chief of National Defense and Secretary of the Party Committee of the Emergency Management Department, presided over a conference and dispatch meeting on the morning of the 3rd, and discussed and judged with the Ministry of Water Resources, the Ministry of Natural Resources, and the China Meteorological Administration. The video links Liaoning, Jilin, Heilongjiang, Guizhou, etc. Ground defense refers to arranging the deployment of dual typhoon "Mesaq" and "Poseidon" defenses.

Leaders from Shang Yong, Xu Ping, Qiong Se, Zhang Yongli and other departments participated.

  The meeting emphasized that relevant regional defense guidelines should attach great importance to typhoon defense work, fully study and judge the impact of strong storms and rains caused by the superposition of the three typhoons "Bavi", "Mesaq" and "Poseidon" in the early stage, and closely monitor the development and changes of typhoons, and strengthen the wind and rain. Forecast and early warning of the situation and risk research and judgment, strictly implement various flood prevention responsibilities, and the persons responsible for flood prevention at all levels must be on their posts and command ahead, and actively do a good job in agricultural disaster prevention and mitigation.

It is necessary to strictly investigate the weak links and hidden risks, focus on the defense of key parts such as large, medium and small reservoirs, tailings ponds, key projects, construction sites, agricultural facilities, etc., and highlight the small and medium river floods and mountain torrent geological disasters caused by short-term heavy rainfall. , Prevent and respond to waterlogging in cities, strengthen wind protection of crops and rural agricultural security.

  It is necessary to refine and improve the personnel evacuation plan, continue to carefully organize the ship's return to port to avoid wind and personnel transfer to avoid danger, ensure that all transfers should be completed, no one household or one person is left, resolutely prevent the transfer of personnel from returning in advance, and strengthen the reserve of flood prevention materials Dispatch with rescue forces to strictly implement safety protection measures to ensure the safety of people’s lives and rescue safety.

Emergency management departments at all levels must persist in training troops in actual combat, continuously improve systems and mechanisms in flood prevention and typhoon prevention, and further utilize the advantages of integrated coordination, rescue and disaster relief, and improve emergency response capabilities.

  The National Defense General Liaoning, Jilin and Heilongjiang working groups are inspecting and guiding typhoon defense work on the front line. On September 2, the Liaoning Working Group of the State General Defense Agency rushed to Fushun, a key area affected by the typhoon, to inspect the implementation of preventive measures, and to check the emergency force preparations and flood prevention material reserves; the Jilin Working Group rushed to Baishan, Liaoyuan and other places to inspect the transfer of guidance personnel to avoid danger Waiting for the work preparation; the Heilongjiang working group rushed to Harbin, Daqing and other places to supervise and inspect the flood prevention and typhoon work.