On July 15, heavy rain suddenly fell in Harbin, and a section of water in the urban area instantly accumulated water, and the water depth exceeded half a meter, causing serious congestion on the section, and many private cars parked nearby were seriously damaged by flooding.

  It is understood that the road section is located at the intersection of two main routes. Due to the low terrain and excessive rainfall, a large amount of rainwater was hoarded immediately. Private cars were forced to stay on the road section, and only some large vehicles were wading through the water. After the emergency personnel cleared, the stagnant water slowly subsided, and the detained vehicles passed the traffic police in an orderly manner. (Reporter Liu Bingxin)

Editor in charge: [Ji Xiang]