Operation resumed on the entire Joetsu Shinkansen on March 19 23:58 on March 19

The Joetsu Shinkansen was 9:00 pm on the 19th, and due to a car trouble occurring at Echigo-Yuzawa Station and performing inspections, we stopped driving on the entire line between Tokyo and Niigata stations, but at 11:50 pm The operation was resumed on all lines.