[HIGHLIGHTS] The traffic flow on the two sides of the Pearl River in Guangdong is saturated with a high-speed "Chelong" length of 17.88 kilometers 2020-05-03T12:35:27.119Z Read the full translated version in English Read the full version from chinanews May on the same topic in other locals All business stories on 2020-05-03