Sichuan: Banan high-speed railway successfully connected to the national "eight vertical and eight horizontal" railway network. At 4 o'clock in the morning on the 23rd, with the successful insertion of the last set of switches, the Nanchong to Bazhong section of the newly built Hanzhong-Bazhong-Nanchong Railway (hereinafter referred to as "Banan") "High-speed Railway" was successfully completed.

The total length of the main line of the project is 147.772 kilometers, the bridge-to-tunnel ratio is 69.76%, and the design speed is 250 kilometers per hour. It is a major transportation project for the cooperative development of the Chengdu-Chongqing twin-city economic circle.