Bidding record in state photovoltaic tender. More bids were received in the most recent round of tenders than ever before.

This also has an impact on feed-in tariffs. Two awards went to projects in which moorland that had been drained during the construction of the solar systems was to be re-wetted. Most projects are to be built on highway or railway shoulders (828 MW) and on arable or grassland areas (530 MW) The largest individual project taken into consideration had a bid volume of 74 megawatts.