On July 16, in the section between Chengdu and Lanzhou Railway from Chengdu to Chuanzhu Temple (Huangshengguan), between Yuelongmen Tunnel and Shiziyuan Tunnel, a yellow track tractor pulled out of Shiziyuan Tunnel and slowed down the 500-meter-long steel rail. Slowly pull the entrance of Jinyuelongmen Tunnel and land on the ballastless track, which marks that the Chengchuan section of the Chengdu-Lanzhou Railway has entered the stage of track laying construction of the plateau section.

(Reporter Liu Zhongjun Produced by Lu Yang)

Responsible editor: [Song Yusheng]