China News Service, Xining, January 8 (Qi Zengbei) The reporter learned from China Railway Qinghai-Tibet Group Co., Ltd. on the 8th that at 9:50 on January 8, it was confirmed by inspection that the Lanqing Line Haishiwan was blocked by the Menyuan earthquake. The line between the Qinghai-Tibet line and the Chahannuo section runs at a speed limit, and many trains will be delayed or suspended.

  At 1:45 on January 8, an earthquake of magnitude 6.9 occurred in Menyuan County, Haibei Prefecture, Qinghai Province (37.77 degrees north latitude, 101.26 degrees east longitude), with a focal depth of 10 kilometers.

The epicenter was 30 kilometers away from the nearest Haomen Station within the Qinghai-Tibet Group Corporation and 140 kilometers away from Xining City.

  Lanxin passenger train runs between Xining Expressway and Menyuan Station with limited speed. It is estimated that K9806, K9822 and K6822 arriving at Xining Station will be delayed by 8 hours, Z166 will be delayed by 5 hours, and Z266 will be delayed by 4 hours. Delayed to varying degrees.

On January 8, passenger trains departing from Xining Station in the direction of Zhangye and far away will be suspended.

  In addition, on January 8, 2022, Urumqi will open D2708 times, D2706 times, D2712 times, D56 times, D8901/2 times, and D8903/4 times.

  China Railway Qinghai-Tibet Group Co., Ltd. reminds passengers to pay attention to the changes of train time at any time. For details, please refer to the station announcement or call the railway customer service center at 12306 for consultation.

(Finish)