This was reported by RIA Novosti with reference to the results of the auction on the GSA Platform.

The offer for Friday during the additional session turned out to be unclaimed; in total, 89.1 million cubic meters of capacity were offered.

m at the point of entry into the Polish section of the highway.

On December 20, Gazprom did not book additional capacities for the transit of natural gas through Ukraine in January and ordered only 21.6% of the proposed capacities for pumping through Poland via the Yamal-Europe pipeline.

On December 21, it became known about the start of reverse gas supplies via the Yamal-Europe pipeline from Germany to Poland.

Press Secretary of the Russian President Dmitry Peskov commented on the situation with gas supplies via the Yamal-Europe pipeline.

According to him, this is "an absolutely commercial situation."

On December 15, Gazprom announced that a third of the volume of gas injected in the summer had been withdrawn from underground gas storage facilities in Europe.

It is noted that Gazprom continues to pump its own gas into five European underground storage facilities.