China News Service, Shenzhen, January 11 (Zheng Xiaohong and Zhu Zuying) The reporter learned from the Shenzhen Metro Group on the 11th that the Hanoi Urban Transit Rail Project (Jiling-Hedong) was completed at 23:53 on December 31, 2020, local time in Vietnam. Trial run "Run Chart".

Shenzhen Metro provided consulting services such as system equipment joint test, trial operation and operation drill for Hanoi, Vietnam.

  The "Jilin-Ha Dong Line" light rail is the first rail transit line constructed in Hanoi, Vietnam, and it is also the backbone of the Hanoi city network.

The line is about 13 kilometers long and has 12 stations.

At the same time, Shenzhen Metro prepared 166 system documents for Vietnam, trained nearly 27,000 trainees, and completed 50 joint test projects.

The picture shows the urban transit rail project in Hanoi, Vietnam (Jiling-Hadong).

Photo courtesy of Shenzhen Metro

  The Hanoi Urban Transit Rail Project is the second overseas project of Shenzhen Metro after the Addis Ababa Urban Light Rail Project in Ethiopia.

Prior to this, Shenzhen Metro helped Ethiopia establish a complete operation and maintenance system, making it the first country in East Africa to enter the "modern urban rail transit".

At present, the Addis Ababa Urban Light Rail Project has completed a 41-month operation and maintenance service and has moved to the stage of providing operation and maintenance consulting services.

  In addition, the Tel Aviv Red Line light rail project signed by Shenzhen Metro in 2017 has basically completed the civil works and is scheduled to be put into operation at the end of October 2022; the urban suburban railway project signed on the 10th of Ramadan in Egypt in 2019 will be provided by Shenzhen Metro for 1.5 years of operation preparation and 2 Annual operation supervision service.

(Finish)