At present, it is the critical stage of the prevention and control of the new crown pneumonia epidemic, and it is also the overlapping period of gradual resumption of production and production by port and shipping enterprises. On the morning of February 29th, a 40,000-ton self-unloading vessel tailored by CSSC Chengxi for Canadian shipowners successfully launched in Jiangyin, Jiangsu. The vessel is 190 meters long and 29 meters wide with a designed draft of 10.5 meters. On June 18, 2019 Production started on the day, and the hull looked close to Meng Mengda, just like a "big whale".

Affected by the epidemic situation, CSSC suspended production during the Spring Festival Spring Festival. After resumption of work, the company simultaneously promoted the epidemic prevention and control and shipbuilding production in accordance with the actual production characteristics. . (Video provided by Jiangyin Rong Media Center, reporter Sun Quan, Zhang Chuanming, Wuxi, Jiangsu)

Editor-in-chief: [Tao Guangxiong]