“The builders have completed the sliding of the first span of the left road part of the Crimean bridge,” he wrote in Telegram.

Khusnullin added that in a few days the span would return to its design position.

Earlier, Rosavtodor announced that the first two spans of the left side of the automobile part of the Crimean bridge, along which transport is directed from the Crimea, will be installed in January.

On October 8, a truck was blown up on the automobile part of the Crimean bridge, as a result of which two spans of the structure partially collapsed.

The FSB reported that the organizers of the terrorist attack on the Crimean bridge were the Main Intelligence Directorate of the Ministry of Defense of Ukraine, its employees and agents.