"The Kyiv side literally more than an hour ago again turned on the power lines with a capacity of 750 kV and 330 kV, which are necessary to meet the needs of the Zaporizhzhya NPP," RIA Novosti quoted Rogov as saying.

He noted that ZNPP was reconnected to the energy system of Ukraine, the radiation background at the station is normal.

On November 3, it was reported that the Zaporozhye NPP was completely disconnected from the Ukrainian energy system.