my country News Service, June 8. According to the WeChat public account of the Ministry of Emergency Management, at present, heavy rainfall continues in southern China, and the No. 2 flood in the Xijiang River in the Pearl River Basin is evolving downstream.

According to the forecast of the meteorological department, in the next two days, there will be heavy to heavy rains in parts of eastern and southern China, eastern Jiangnan and other places, and there will be heavy rains in the coastal areas of Guangdong and Fujian.

Huang Ming, deputy commander-in-chief of the National Defense General and Minister of Emergency Management Department, emphasized that it is necessary to thoroughly implement the spirit of General Secretary Xi Jinping's important instructions on flood control and disaster relief work, adhere to bottom-line thinking, highlight regional characteristics, and pay attention to flood control and disaster relief work to ensure the lives and property of the people. Safety.

  On June 8, Zhou Xuewen, Secretary-General of the National Defense General Department, Deputy Minister of Emergency Management and Deputy Minister of Water Resources, hosted a video conference on flood control, and discussed with the China Meteorological Administration, the Ministry of Water Resources, the Ministry of Natural Resources, and the Ministry of Housing and Urban-Rural Development. The video link Fujian, Guangdong, Guangxi, Sichuan, Guizhou, Yunnan and other places to prevent and rescue the fire brigade, forest fire brigade, continue to study and judge the current flood situation and development trend, study and deploy the rainstorm and flood prevention and response work in key areas.

  The consultation emphasized that it is necessary to adhere to the responsibility of compacting flood control and not to relax, effectively improve the sensitivity of flood control responsible persons at all levels to extreme rainstorms, strengthen rolling consultations and judgments, and strictly implement the flood control guarantee responsibility system.

It is necessary to persist in the linkage of early warning and response, guide and urge the grassroots to improve flood control emergency plans as soon as possible, establish and improve the linkage mechanism of meteorological early warning and emergency response, and implement work measures in a timely manner after the response is initiated.

It is necessary to adhere to the key points of anchoring and defense, strengthen the flood defense of important rivers, do a good job in the scheduling of key flood control projects, and strengthen the inspection and defense of over-alarm dyke sections; prevent mountain torrents and geological disasters, and transfer the threatened people in time; continue to carry out hidden danger investigations to ensure that small and medium-sized reservoirs and high-level ponds and dams for flood control safety; pay close attention to urban flood control and drainage safety, and take timely shutdown and control measures as appropriate.

It is necessary to insist on ensuring the safety of rescue and rescue, and install rescue force equipment for important parts and weak links, and implement safety protection measures to ensure the safety of rescue.

It is necessary to insist on doing well in disaster relief and do not relax, properly do disaster relief and relief work for disaster-stricken areas, and implement epidemic prevention and control measures for relocating and relocating people and disaster-stricken people.