(Two Sessions Express) The delegations of Sichuan and Chongqing provinces and cities suggested to accelerate the integration of Sichuan and Chongqing energy security construction

  China News Service, Beijing, March 5th (Liang Qinqing) On March 5th, the Chongqing delegation and the Sichuan delegation, who attended the fifth session of the 13th National People's Congress, jointly submitted to the conference "On Accelerating the Promotion of Sichuan-Chongqing Energy" in the name of the delegation. Suggestions for Safeguarding Integrated Construction", calling on the national level to establish an inter-departmental coordination mechanism, carry out comprehensive energy reforms in the Sichuan-Chongqing region, and provide energy support for the high-quality development of the Chengdu-Chongqing economic circle.

  The delegates believed that the recommendations of the whole delegation played a very important role in promoting the solution of bottlenecks restricting economic and social development and meeting the urgent needs of high-quality development.

The two provincial and municipal delegations jointly put forward suggestions, which further highlighted the importance and urgency of promoting the resolution of related issues.

  The representatives believe that with the implementation of various major deployments, the construction of the Chengdu-Chongqing economic circle has achieved momentum and accelerated economic and social development. Construction is restricted.

The western Sichuan region is an important hydropower base in the country. The Shuangcheng Economic Circle in the Chengdu-Chongqing region is the load center of the entire Sichuan-Chongqing region. The power grid structure between the western Sichuan-Chengdu urban agglomeration and the power grid structure between Sichuan and Chongqing is relatively weak. has become saturated.

  In order to accelerate the integrated development of Sichuan-Chongqing energy and ensure the construction of the twin-city economic circle, the representatives suggested that Sichuan-Chongqing should be included in the national energy security key areas, and the energy security problem should be solved as a whole.

  Specifically, it is to strengthen the local consumption of hydropower and natural gas, and to solve the problem of "less kerosene shortage" as a whole.

The delegates called for the construction of natural gas peak-shaving power generation projects in load centers and major natural gas producing areas, and the inclusion of gas for power generation into the scope of natural gas guarantee for people's livelihood; coordination of cooperation between Sichuan and Chongqing with coal-producing provinces and large energy groups; improvement of coal transportation channels and reduction of joint venture railways freight rates; establish coal reserve bases in major coal consumption areas and key nodes of transportation channels in Sichuan and Chongqing.

  The delegates also suggested supporting the construction of the Chengdu-Chongqing hydrogen corridor, incorporating the Chengdu-Chongqing economic circle into the second batch of national fuel cell vehicle demonstrations, supporting the construction of a hydrogen fuel industry innovation alliance in Sichuan and Chongqing, the layout and construction of hydrogen refueling stations, and the construction of hydrogen-oriented fuel cell vehicles. Public service system for R&D, testing, testing and certification of battery vehicles.

  The delegates also proposed that the national major projects in Sichuan and Chongqing should be included in the single list of energy consumption, and provide support in terms of energy consumption, carbon emission intensity and space.

(over)