On the 3rd, at the press conference of "Beijing's "14th Five-Year Plan" Period Major Infrastructure Development Plan", Yi Feng, deputy director of the Municipal Water Affairs Bureau, introduced Beijing's water affairs work during the "14th Five-Year Plan" period.

According to the plan, by the end of the "14th Five-Year Plan" period, the compliance rate of sponge cities in Beijing's built-up areas will reach more than 40%, and the water accumulation points in the main urban area will be dynamically cleared.

The reporter was informed that during the "14th Five-Year Plan" period, Beijing will carry out the prevention and control of accumulated water and waterlogging, and build a waterlogging prevention and control system of "reduction at the source, pipeline network transportation, flood peak reduction, and emergency response to exceeding the standard" to solve the problem of "city looking at the sea".

  The plan shows that by the end of the "14th Five-Year Plan" period, the water consumption per unit of regional GDP will be reduced to less than 10 cubic meters, the total annual water consumption for production and living will be controlled within 3 billion cubic meters, and the annual groundwater mining volume will be reduced to 1.4 billion cubic meters. about.

The safety factor of water supply in the central city and sub-centers of the city exceeds 1.3, and the city's water supply capacity reaches 10 million cubic meters per day.

The compliance rate of sponge cities in built-up areas has reached more than 40%, and the water accumulation points in the main urban areas have been dynamically cleared.

The city's sewage treatment rate reached 98%, and the ecological conditions of rivers and lakes continued to improve.

  Yi Feng introduced that during the "14th Five-Year Plan" period, the city will focus on five major water development goals, systematically plan, and build a modern water service guarantee that is compatible with Beijing's "four centers" strategic positioning and the development goals of a world-class harmonious and livable city. system.

  The first is to focus on the goal of "safety", strengthen the requirements of "rigidity" and "resilience", and build a solid water safety guarantee system.

The focus is to accelerate the construction of a water-saving society and fully implement the "Beijing Water-saving Action Implementation Plan".

Promote comprehensive management of groundwater overexploitation areas, and implement water storage in the ground and storage in reservoirs.

Completion of the standard management of backbone dykes, promotion of key flood control projects and construction of key flood storage and detention areas, and basic completion of the “Tongzhou Weir” flood control project system.

Carry out the prevention and control of accumulated water and waterlogging, and build a waterlogging prevention and control system of "reduction at the source, pipeline network transmission, flood storage and peak reduction, and emergency response to exceeding the standard" to solve the problem of "city looking at the sea".

  The second is to focus on the goal of "cleanness", strengthen the protection and management of "sources" and "leaders", and speed up the improvement of the shortcomings of water infrastructure.

Continue to fight for clear water, implement the third three-year action plan for pollution control, improve urban sewage treatment and reclaimed water utilization facilities, carry out overflow pollution control in central urban areas and suburban new towns, and promote rural domestic sewage collection and treatment according to local conditions.

  The third is to focus on the "ecological" goal, strengthen the measures of "water conservation" and "water replenishment", and further expand the new path of ecological water control.

In accordance with the planning and construction goals of "one-year launch, two-year demonstration, five-year formation, ten-year conservation, and many-year landscape", the construction of Wenyu River Park and other projects will be accelerated to form a large-scale urban blue-green ecological space.

Study the ecological water volume and water source guarantee plan of key rivers, and ensure the ecological water use of key rivers and lakes.

  The fourth is to focus on the goal of "beautiful", strengthen the construction of "demonstration" and "standardization", and constantly polish the beautiful background of green water and green mountains.

Make more rivers and lakes "internet celebrity check-in places", so that more citizens can enjoy the dividends brought by the improvement of water ecology, and enhance their sense of happiness and gain.

Continue to promote the urban river and lake water system landscape improvement project to improve the accessibility and livability of the waterfront space.

Expand fishing, ice skating, kayaking and other service areas, and expand the scope of water infrastructure open to the public.

Focusing on the construction of the cultural belt of the Grand Canal, the construction of ship locks and docks along the line will be implemented, the Tongzhou section of the North Canal will be opened to navigation, and the waters such as the Shunyi New City section of the Chaobai River will be opened to tourism.

Protect the spatial pattern of the old city with six seas and eight waters in the functional core area of ​​the capital, and promote the restoration of historical water systems and the improvement of waterfront space.

  Fifth, focus on the goal of "serving the people", strengthen "co-governance" and "sharing", and continue to improve the level of public water services.

The key point is to take the service guarantee as the foundation, improve the water public service and management system, innovate the way of water service for the people, and enhance the awareness of water public service.