China News Service, September 16th. According to the website of the Ministry of Emergency Management, the 11th typhoon "Hongxia" this year is expected to pass through the sea south of the Zhongsha and Paracel Islands on the 17th, and head towards the central coast of Vietnam via the sea south of Hainan Island on the 18th. , The intensity continues to strengthen, and the maximum intensity is expected to reach the typhoon level.

Affected by this, there will be 6 to 7 strong winds in the Bashi Strait, the eastern and southern South China Sea, the Zhongsha Islands, and the Huangyan Island today and tomorrow. Among them, the eastern part of the South China Sea will have 8-9 winds.

On the 16th, the National Defense Office and the Emergency Management Department discussed and judged the typhoon development trend with the meteorological and water conservancy departments. The National Defense Office issued notices to Hainan, Guangdong, Guangxi, Fujian and other provinces (autonomous regions) to prevent the typhoon. Hongxia" defense work.

  The notice emphasizes that it is necessary to pay close attention to the development trend of typhoon "Hongxia", strengthen the joint consultation analysis and judgment, adhere to the people's supremacy and life, put the safety of people's lives in the first place, and supervise the ships and operations in the affected area. Evacuate personnel to a safe area in time, and do a good job in safety management of key locations such as beaches, tourist attractions, ports and docks, fishing rafts, etc.; strictly prevent secondary disasters, and focus on prevention of floods in small and medium-sized rivers, mountain torrents, geological disasters, and urban waterlogging. Relocate personnel from low-lying flood-prone areas, dangerous old communities, underground facilities, construction sites and other dangerous areas in advance, and make preparations for emergency rescue in advance to prevent casualties.

Under the premise of ensuring the safety of flood control, rain and flood resources should be blocked and stored in a timely and appropriate amount to reserve water for drought resistance in the next stage.