China News Service, Beijing, June 1 (Chen Hang) On the 1st, the reporter learned from Beijing's flood control work press conference that there are 28 municipal emergency rescue teams in Beijing, and relying on professional departments and social organizations, a total of A total of 1,657 flood control teams with more than 200,000 people have been formed.

  In order to prepare the team's materials in advance, Beijing actively docks the troops stationed in Beijing, jointly investigates the flood control and rescue materials warehouse and key parts of the rescue, and studies and implements the military's training and calling procedures for flood control and rescue. Strengthen the professional training of the municipal emergency rescue team, prepare the newly added 6 rescue teams including the aviation rescue and fire rescue team, and prepare all kinds of professional flood rescue materials such as assault boats, life jackets, life detectors, etc., study the aviation rescue team to participate in flood prevention, Working procedures for emergency rescue operations of natural disasters such as earthquakes. Strengthen the purchase and supplement of flood control and drought relief materials. At present, there are 67 municipal-level emergency supplies for flood control and drought relief, which can meet the emergency needs of reservoirs, rivers, embankments, and dams.

  Liu Bin, deputy commander of the Beijing Flood Control and Drought Relief Command, deputy director of the Municipal Emergency Management Bureau, and spokesman said that the executive head accountability system is strictly implemented, and the four-level flood control responsibility system of the city, district, street town, and village community is compacted step by step Responsibilities of flood control and drought resistance are implemented. The districts have implemented the promotion step by point, clarifying the responsible persons one by one for the reservoirs, rivers, torrents, small ponds, disasters, waterlogging points, key projects, scenic spots, etc. within the jurisdiction to achieve full coverage of flood control responsibilities.

  In response to the fact that there are many key projects such as city sub-centers and the Winter Olympics, and the social impact is great, the Beijing Flood Control Office has also established a special command institution to increase overall coordination and dispatch to ensure absolute safety in key areas of key projects.

  According to Liu Bin, all levels of the city ’s prevention index carried out in-depth investigations and inspections of hidden flood hazards. On the one hand, they focused on epidemic prevention and control, and on the other hand, hidden hazard investigation and rectification. There are 316 sluice safety issues, 56 key road flood prevention hidden dangers, 705 deep foundation pit projects, 129 high earth mound projects, 108 bid sections on 16 lines of the Shi Rail Transit Project, and a suspected dangerous house of 179,500 square meters. Investigate 636 "four chaos" (chasing, chasing, chaos, and chaos) problems in rivers and lakes, and established 193 hidden accounts. (Finish)