Share

16 February 202016.12 The first Frecciarossa wagon derailed on 6 February from the High Speed ​​line in Ospedaletto Lodigiano (Lodi) was lifted off the tracks and placed on the exceptional means of transport, which will lead it to repair. The operation took place quickly, in about 5 minutes. Meanwhile, the last batch exchange provided by Alstom Ferrovie was found, considered defective.