Load test: on the railway part of the Crimean bridge, tests of load-bearing structures began
2019-10-23T10:51:29.259Z
On the railway part of the Crimean bridge, load tests of load-bearing structural elements began. Heavy railroad trains operate on the site to monitor the strength, each of which consists of a locomotive and 23 cars with crushed stone with a total weight of 2.4 thousand tons. It is reported that the movement of freight trains on the Crimean bridge will open in June 2020.
Source: russiart