“Connected to the network. There is a planned set of power. Approximately nominal power (1000 MW) will be recruited at 04:00 Moscow time, ”the TASS quotes a representative of the center.

Earlier in the "Rosenergoatom" reported on the disruption of three nuclear power units as a result of turning off one of the transformers.

As explained in “Rosenergoatom”, the disconnection of three power units from the network was due to the shutdown of two high-voltage power lines. Those, in turn, turned off due to a circuit on one of the transformers.