The Three Gorges North Line Ship Lock and Gezhouba No. 1 Ship Lock will simultaneously implement planned suspension for maintenance starting at 8:00 on the 21st.

On February 21, the 2024 planned shutdown of the Three Goring North Ship Lock was officially launched. Key urgent cargo ships, grain transport ships, container ships, demonstration ships, integrity ships and other key ships will be dispatched in accordance with the "Notice of the China Long Shipping Bureau on the Classified Arrangements for Ship Passing through the Lock during the Maintenance Period"