On March 31, the Meilong High-speed Railway successfully erected its first contact line between Wuhua and Longchuan West. The contact wire is the power supply line of the high-speed train.

Its erection and adjustment quality directly affect the flow of the locomotive and the stability of its operation. The "strong current" project has entered a critical stage of construction. stage, pressing the "acceleration button" for the opening of operations in 2024. The travel time from Meizhou to Guangzhou, Shenzhen and other cities in the Guangdong-Hong Kong-Macao Greater Bay Area will be shortened.