The last bridge box of the Macao-Taipa 4th Bridge, the largest cross-sea bridge in Macau, was hoisted at 21:00 on March 12, and the bridge was successfully closed. The bridge boxes were transported by ship to the construction site via waterways, and a crane was used to lift the boxes to the height of the bridge deck before docking and installation.

It is an important node for ships to enter and leave the Xijiang River and to and from Hong Kong and Macao.