Domestic large cruise ship No. 2 will be named and delivered at the end of 2026.

The ship has a gross tonnage of approximately 142,000 tons, an overall length of 341 meters, a width of 37.2 meters, and a design draft of 8.17 meters. According to Waigaoqiao Shipbuilding's plan, the total construction time of the No.2 ship will be reduced by 20% compared with the first large-scale cruise ship "Aida·Modu"