A first navigation corridor planned through the rubble of the Baltimore bridge. This corridor will, however, initially not be wide enough to allow the passage of large vessels.

It will therefore initially be reserved for vessels "involved in operations" as well as emergency vessels. An opening of the bridge planned for this Monday “It will not beWide enough to allowed container ships to pass through. Work is underway to gradually open the passage to more ships, but we do not have a timetable for this,” he said.