On the evening of November 23, the 2022 Beijing Winter Olympics Zhangjiakou Winter Olympic Village (Winter Paralympic Village) carried out the first regular electricity load test and lighting ceremony.

  Zhangjiakou Winter Olympic Village (Winter Paralympic Village) is located in the center of the core area of ​​Chongli Winter Olympics. The above-ground building area is about 135,000 square meters and the underground area is about 103,000 square meters.

The test covered all areas in the village, and tested the full-load pressure of the lamps in 31 athlete apartment buildings and 22 commercial spaces in the square area.

  In the next step, Zhangjiakou Winter Olympic Village (Winter Paralympic Village) will continue to carry out load tests on water supply and drainage supply, hot water supply and electric heating supply, and overall evaluate, improve and upgrade the basic guarantee capabilities and level of the operation team to welcome the upcoming The all-element drills and tests held have laid a solid foundation for the smooth operation of the game.

(Xing Lu, Chen Liang)

Editor in charge: [Wang Kai]