Tokaido Shinkansen operation restarted at 1:29 on July 28

Due to the heavy rain, the Tokaido Shinkansen was suspended between Shin-Fuji and Kakegawa on the down line and between Kakegawa and Shizuoka on the up line, but resumed operation at 1:18 am.