“Now I looked at the reports of the main operators on pressure: 14.07 - 473 mm (Hg -

RT

), 20.07 - 273 mm, 25.07 - 200 mm.

On the eve of docking with MLM: 28.07 - 167 mm, 29.07 - 160 mm.

The predicted and not at all a "sharp" drop in pressure in the still problematic "Zvezda".

And it has nothing to do with MLM, ”he wrote on Twitter, commenting on messages about a“ sharp ”drop in pressure in the module.

As it became known earlier, the pressure in the Zvezda transition chamber, where the air leak was recorded, dropped to 154 mm Hg.

Art.