China News Service, Zhangjiakou, November 25 (Reporter Cui Tao) Zhangjiakou Winter Olympic Village (Winter Paralympic Village) conducted full-load and full-pressure tests on water supply and drainage, hot water supply, electric heating supply, etc. on the 25th, and the venue is running About 500 people in the team participated in the test activities at the same time.

At this point, the full-load and full-pressure test of this energy facility has been completed as a whole.

  In order to ensure the safe operation of facilities and equipment in Zhangjiakou Winter Olympic Village (Winter Paralympic Village) during the game, and to ensure the successful completion of the reception service tasks during the event, Zhangjiakou Winter Olympic Village (Winter Paralympic Village) carried out full energy facilities from November 23 to 25. Full-load full-pressure test: Full-load full-pressure detection of facilities and equipment such as power supply, water supply and drainage supply, hot water supply, electric heating supply and other facilities and equipment in the residential area, operation area, and square area of ​​the stadium.

  On the evening of November 23, Zhangjiakou Winter Olympic Village (Winter Paralympic Village) carried out the first regular electricity load test and lighting ceremony to test the lighting in various areas of the venue.

The 31 athletes' apartment buildings in the Winter Olympic Village and 22 commercial spaces in the square area are gradually lit up, shining brightly, indicating that the place is ready to provide athletes with high-quality, efficient, warm and caring services during the game.

  According to reports, through this test, effective evaluation, improvement and promotion of Zhangjiakou Winter Olympic Village (Winter Paralympic Village) infrastructure support capacity and level, so as to meet the upcoming all-element drill test, and lay a solid foundation for the smooth operation of the game.

(over)