JR Hokkaido has resumed operation of some of the trains departing from and arriving at Sapporo Station, which had been suspended due to heavy snowfall.

A special train bound for Otaru departs from Sapporo Station at around 7:30 pm, and we plan to operate a total of nine trains between Sapporo and Otaru on the 8th.



On the other hand, the service between Sapporo and New Chitose Airport, which was originally scheduled to resume operation on the night of the 8th, will be suspended on the 8th, with the aim of resuming operations from the morning of the 9th.