Due to the impact of this earthquake, the Asahi Breweries and Kirin Breweries factories in Tohoku will stop production, and the Fukushima factory of Asahi Breweries is expected to resume production later this month.

According to Asahi Breweries, production will be suspended for the time being from the 15th due to the damage to the manufacturing equipment at the factory in Motomiya City, Fukushima Prefecture.



Production is expected to resume later this month.



Although the factory's warehouse is in stock, shipments will be postponed on the 15th and will resume after the 16th due to the collapse of the cargo.

On the other hand, as a result of inspecting the equipment at the factory in Miyagino-ku, Sendai City, Kirin Brewery found that the drainage pipe, ceiling, and part of the wall were broken, and that the products in the warehouse collapsed. ..



For this reason, production will stop after the 15th and will resume on the 17th of this month at the earliest.