According to JR, in response to this earthquake, we will suspend operation from the first train on the 14th on almost all routes in Miyagi, Fukushima, and Yamagata prefectures for safety confirmation, and aim to start operation in the afternoon.
The Tohoku Shinkansen will be suspended from the first train on the up and down lines between Nasushiobara Station and Morioka Station, and will resume as soon as safety is confirmed.
It is
▽ Yamagata Shinkansen
▽ Tohoku Main Line
▽ Joban Line
▽ Sengoku Tohoku Line
▽ Senseki Line
▽ Stone
Winding ▽ Kesennuma Line
▽ Senzan
Line
▽ Rikuha
East Line
▽ Rifu
Line
▽ Rikuha
West Line
▽ Ou
Main
Line
▽ Ban-
Etsusai
Line
▽ Ban-
Etsu
Most sections of the
East Line
▽ Tadami Line
▽ Suigun
Line
▽ Hagoshi
Main Line
▽
Yonesaka Line.
Regarding the operation of the Tohoku Shinkansen, we have decided to suspend operation from the first train on the up and down lines between Nasushiobara Station and Morioka Station, and will resume as soon as safety is confirmed.
In addition, the Abukuma Express, which connects Miyagi and Fukushima prefectures, will suspend operation from the first train and will resume operation as soon as safety is confirmed.
On the other hand, according to the Sendai City Transportation Bureau, the Sendai City Subway Namboku Line and Tozai Line will resume normal operation from the first train on the 14th.