According to JR, in response to this earthquake, we will suspend operation from the first train on the 14th on almost all routes in Miyagi, Fukushima, and Yamagata prefectures for safety confirmation, and aim to start operation in the afternoon.

The Tohoku Shinkansen will be suspended from the first train on the up and down lines between Nasushiobara Station and Morioka Station, and will resume as soon as safety is confirmed.

It is


▽ Yamagata Shinkansen


▽ Tohoku Main Line


▽ Joban Line


▽ Sengoku Tohoku Line


▽ Senseki Line


▽ Stone


Winding ▽ Kesennuma Line


▽ Senzan


Line


▽ Rikuha

East Line

▽ Rifu

Line

▽ Rikuha


West Line


▽ Ou

Main

Line


▽ Ban-


Etsusai

Line

▽ Ban-

Etsu

Most sections of the

East Line


▽ Tadami Line


▽ Suigun

Line

▽ Hagoshi

Main Line



Yonesaka Line.



Regarding the operation of the Tohoku Shinkansen, we have decided to suspend operation from the first train on the up and down lines between Nasushiobara Station and Morioka Station, and will resume as soon as safety is confirmed.



In addition, the Abukuma Express, which connects Miyagi and Fukushima prefectures, will suspend operation from the first train and will resume operation as soon as safety is confirmed.



On the other hand, according to the Sendai City Transportation Bureau, the Sendai City Subway Namboku Line and Tozai Line will resume normal operation from the first train on the 14th.