Disinfection begins in flooded areas Chiba Mobara October 27 17:19

In Mobara City, Chiba Prefecture, where flood damage occurred in a wide range due to the heavy rain on the 25th, disinfection work began around the house where water was drawn from 27th.

In Mobara City, Chiba Prefecture, five rivers such as the Ichinomiya River and Toyota River flowing through the city due to heavy rain on the 25th caused flooding, and inundation of houses, etc., continued in a wide area of ​​the basin.

Among them, water was drawn in each area of ​​Yachiyo, Midorimachi, and Nagashimizu in the city center of Ichinomiya River, and the person in charge started disinfection work from the morning of the 27th.

When a house is inundated, bacteria and molds are more likely to propagate, and residents may get infections, so cleaning and disinfection are important, so the city will continue to work in damaged areas after 28th. I want to go forward.

A man in his 60s living in the Ichinomiya River basin said, “The water was approaching a considerable height and the floor was flooded. Thank you for disinfection.”