Tobu Railway Nikko Line Partial operation resumed October 14th 13:49

The Tobu Railway Nikko Line, which had been suspended due to the impact of Typhoon No. 19, resumed operation at 0:30 pm between the upper and lower lines between Minamikuri Bridge and Kuri Bridge.

Between Kurihashi and Tochigi, and between Shinkanuma and Shimoimaichi, we continue to postpone driving.