JR Kururi Line Down line Operation resumed on 15th October at 21:34

According to JR East, the JR Kururi Line running in Chiba Prefecture, which had been put off driving due to the influence of Typhoon No. 19, resumed the down line operation at 8:48 pm on the 14th because safety was confirmed.

On the 15th, it means that both the upper and lower lines will operate on a regular schedule from the first train.