Hokuriku Shinkansen 15th non-communication section shortened from Nagano to Joetsu Myoko October 14th 21:57

According to JR East, the Hokuriku Shinkansen was not connected between Nagano Station and Itoigawa Station due to the typhoon, but the safety check of the track progressed. Will be shortened between.

As a result, the loopback operation is performed in the next section.
▽ Tokyo Station-Nagano Station ▽ Kanazawa Station-Joetsu Myoko Station

The number of services is about ▽ between Tokyo and Nagano,
▽ Between Kanazawa and Joetsu Myoko is about 1 hour to 1 hour and a half.

It takes a considerable amount of time to resume operation on all lines.