Typhoon No. 19 Traffic Information Summary October 14, 5:41, as usual, except for some metropolitan railways

Most of the railway companies in the Tokyo metropolitan area resumed operation on the 13th, with no major confusion at any station. On the 14th, most of the routes are expected to be operated on a regular schedule from the first train.

On the 14th, both JR and private railway companies in the Tokyo metropolitan area are expected to operate on the regular schedule from the first train on most routes, except for some routes.

The Tohoku Shinkansen and Akita Shinkansen on the 13th, and the Joetsu Shinkansen resumed operation on the 13th, and will continue to operate as usual from the first morning on the 14th.

The Hokuriku Shinkansen will reduce the number of trains operating from the night of 13th, and will perform a temporary return operation between Tokyo Station and Nagano Station. I will stop driving all day between stations.

The Yamagata Shinkansen is expected to resume operation around noon.

You can check the latest information on the operation status of each railway company on the website.