Power outage in Kanagawa Prefecture almost eliminated TEPCO September 11, 18:31

According to TEPCO, almost all blackouts in Kanagawa Prefecture due to the impact of Typhoon No. 15 were resolved at 5:30 pm on the 11th.

This means that all of TEPCO's power grid in Kanagawa has been restored, but there are some places where blackouts continue due to the damage of individual houses.

In the prefecture, a maximum of about 141,500 households had a power outage, and Kamakura City had over 1000 outages until the evening of the 11th.