After power failure recovery Tomorrow or some Chiba Kanagawa and other parts September 9 14:35

In the Kanto region, power outages continue, mainly in Chiba Prefecture, but TEPCO has revealed that it is difficult to recover within 9 days in some areas of Chiba Prefecture and Kanagawa Prefecture.

According to the Ministry of Economy, Trade and Industry, within TEPCO's jurisdiction, approximately 840,000 houses were out of power, mainly in Chiba Prefecture, at 0:30 pm.

About the cause TEPCO says that the equipment is damaged, such as a power line falling down in Kimitsu City, Chiba Prefecture.

Regarding the outlook for recovery from power outages, TEPCO says that it is difficult to complete the restoration within 9 days in some areas such as the Miura Peninsula in Chiba Prefecture and Kanagawa Prefecture, along the coastal area in Ibaraki Prefecture, and in the Higashi-Izu area in Shizuoka Prefecture. The

On the other hand, Tochigi Prefecture and Tokyo are expected to recover within 9 days except for some areas where recovery work is difficult.

TEPCO has a policy of urgent recovery work, with support from other power companies.