Tokaido Shinkansen operation resumed September 9 at 7:49
According to JR Tokai, the Tokaido Shinkansen was scheduled to stop driving between Tokyo and Mishima and going up between Odawara and Tokyo due to the typhoon, but resumed driving at 7:40 am.
Catch up locals' news in English
2019-09-08T22:56:16.091Z
According to JR Tokai, the Tokaido Shinkansen was delayed between Tokyo and Mishima, and Odawara and Tokyo going down due to the typhoon, but ...
Tokaido Shinkansen operation resumed September 9 at 7:49
According to JR Tokai, the Tokaido Shinkansen was scheduled to stop driving between Tokyo and Mishima and going up between Odawara and Tokyo due to the typhoon, but resumed driving at 7:40 am.
Source: nhk